Group News
The Group Held a Detailed Geological Report Review Meeting for Uganda Salt Mine Project
Source: 原创     Time:2019-08-15       Publisher:admin
Share:

新浪微博

朋友圈

QQ空间

豆瓣网

QQ好友

On August 10, 2019, the group held a review meeting on detailed geological report for salt mine project of Uganda Rwenzori Shining Star co., LTD. The meeting was presided over by Ma Jinkui, chief engineer of Uganda salt mine project. Yan Yu, chairman, Wang Hailong, vice president and other leaders of the group attended the meeting.

Liu Chenglin, Chinese academy of geological sciences researcher at the institute of mineral resources, Hu Shuya, processing design director and Hu Hanyue, mining design director of China Tianchen Engineering Corporation (TCC), Li Canxian, chief engineer of Shenzhen Zhong Hang Resources Co., LTD, Yan Sujuan, deputy general manager of Kunming Zhonghang Phosphorus Chemical co., LTD, and Wu Shengbin, mining design director of China Blue Star Changsha Design and Research Institute (China Blue Star Changsha Engineering Technology Co., LTD) etc. experts invited to attend the meeting. At the meeting, the expert group listened to the detailed geological report of Uganda salt mine project submitted by Changsha Light Industry and China Survey & Design Institute, and review the report.

During the review meeting, first of all, the panel of experts to the Uganda salt mine project detailed geological report gave full affirmation, the survey results are reasonable, scientific and authenticity, but also there are many problems. After the review meeting, the expert group conducted in-depth research and discussion with the leaders of the group and the project team on the product plan and mining plan.


At the end, Yan Yu, chairman of the group proposed new ideas on the market situation, development mode, product positioning and overall planning and operation of the Uganda salt mine project from the overall perspective of the project, and communicated with the experts.
The review meeting of Uganda salt mine project has preliminarily defined the development value of the project, mining scheme and implementation path, which has important guiding significance for the project to enter the next stage.

Shining Star Group @All Rights Reserved 滇ICP备10200980号-4  滇公网安备53011102000829号
Technical support:AYKJ